The first Electric Train Trial Run: Around 40 km of track from Banihal to Khari to Sangaldan section covered

The first Electric Train trial run from Banihal to Khari to Sangaldan section on Banihal-Katra section of Udhampur-Srinagar-Baramulla Rail Link (USBRL) project in Ramban was successfully conducted. It was conducted on around 40 km of track and tunnels between Banihal and Sangaldan Railway Stations.